Many extensions in England can be built without a full planning application, under what are called permitted development rights. Whether yours qualifies depends on the type of house, how far the extension reaches, how tall it is and where the property is. Here are the limits, and the situations where you will need planning permission.

What can I build without planning permission?

For a single-storey rear extension to a house, the key limits are:

3mmaximum depth beyond the original rear wall for a semi-detached or terraced house
4mmaximum depth for a detached house
4mmaximum height of a single-storey extension
50%of the land around the original house is the most that extensions and outbuildings can cover
How far a single-storey rear extension can reach Plan view of a house and garden. The permitted extension reaches 3m from the rear wall for semi-detached and terraced houses and 4m for detached houses. The prior approval route allows 6m and 8m. Rear garden (boundary dashed) Original house rear wall 3msemi / terraced 4mdetached Prior approval: up to 6m (semi / terraced) Prior approval: up to 8m (detached) Not available on Article 2(3) land Permitted development Within 2m of boundary: eaves max 3m
Plan view, not to scale. Depths are measured from the rear wall of the original house. Extensions must also stay within the height and 50% coverage limits.

Other types of extension have their own limits:

Type of extensionPermitted development limits
Single-storey rearUp to 3m deep (4m detached), up to 4m high. Eaves no higher than 3m within 2m of a boundary.
Larger single-storey rear (prior approval)Up to 6m deep (8m detached), after notifying the council through a prior approval application. Not available on Article 2(3) land or a Site of Special Scientific Interest.
Side extensionSingle storey only, up to 4m high, and no wider than half the width of the original house.
Two-storey rearNo more than 3m beyond the original rear wall, and not within 7m of the boundary opposite the rear wall. Roof pitch should match the house.

What is the larger home extension (prior approval) route?

If you want a single-storey rear extension deeper than the standard limits, you can go up to 6m for a semi-detached or terraced house, or 8m for a detached house, through the prior approval process. You notify your local planning authority, which considers the impact on neighbours before you build.

Not everywhereThe prior approval route is not available on Article 2(3) land (which includes conservation areas and the Cotswolds National Landscape) or on a Site of Special Scientific Interest.

When do I definitely need planning permission?

Usually permitted development

  • Single-storey rear extensions within 3m or 4m
  • Single-storey side extensions within the width and height limits
  • Two-storey rear extensions within 3m and at least 7m from the rear boundary

Needs planning permission

  • Side extensions of more than one storey
  • Anything forward of the front of the house, or of a side wall facing a road
  • Verandas, balconies or raised platforms
  • Extensions to flats and maisonettes
  • Anything beyond the limits above

Permitted development rights can also be removed by an Article 4 direction or a condition on an earlier planning permission, so it is worth checking your property's planning history with the council.

The conditions that catch people out

  • "Original house" means the house as first built, or as it stood on 1 July 1948. Earlier extensions count towards your allowance.
  • Height: an extension cannot be higher than the highest part of the existing roof, or higher at the eaves than the existing eaves.
  • Materials must be similar in appearance to the existing house.
  • Upper-floor side windows on a two-storey extension must be obscure-glazed and non-opening, unless the opening part is more than 1.7m above the floor.
  • No chimneys, flues or soil pipes can be added under these rights, and the existing roof cannot be altered.

What changes in the Cotswolds and conservation areas?

Conservation areas and the Cotswolds National Landscape are "Article 2(3) land". There, all side extensions and all rear extensions of more than one storey need planning permission, exterior cladding is not permitted development, and the 6m/8m prior approval route is not available.

Extending in the Cotswolds?We cover this in detail in extending a home in the Cotswolds or a conservation area.

Do I still need building regulations approval?

Yes, in most cases. Planning permission is about how the extension looks and affects its surroundings; building regulations are about how it is built. Most extensions need building regulations approval even when they do not need planning permission. Building control checks areas including:

AreaArea
Foundations and walls below groundDrainage
External and internal wallsRoofs
Doors and windowsElectrics
Kitchens and bathroomsEnergy efficiency and ventilation

If your extension is close to a neighbour's property you may also need to serve notice under the Party Wall Act. See do I need a party wall agreement for my extension?

How we help: before quoting, we check whether your extension falls within permitted development, needs prior approval or needs a full application, and we work with your designer on the building regulations drawings so the build is approved first time.