Garden rooms, home offices, gyms, workshops and summer houses are among the most popular projects we build. Most can be built without planning permission, as "outbuildings" under permitted development, as long as they stay within some clear limits on height, position and size. Here they are.
How tall can a garden room be without planning permission?
What are all the permitted development limits?
| Rule | Limit |
|---|---|
| Position | Not on land forward of the wall forming the front (principal elevation) of the house. |
| Storeys | Single storey only. |
| Height | 2.5m within 2m of a boundary. Elsewhere 4m with a dual-pitched roof, or 3m with any other roof. Eaves no higher than 2.5m. |
| Coverage | No more than half the land around the original house can be covered by additions and other buildings. |
| Verandas and decking | No verandas, balconies or raised platforms; any platform no more than 0.3m high. |
| Use | Must be incidental to the house (office, gym, studio, playroom, storage), not separate self-contained accommodation. |
The same outbuilding rules cover sheds, greenhouses, garages, saunas, kennels and even swimming pools and ponds. See do I need planning permission for a swimming pool?
Can I sleep in a garden room or use it as an annexe?
Usually permitted development
- Home office or studio
- Gym or games room
- Hobby room or workshop
- Garden storage
Needs planning permission
- A self-contained annexe with its own bedroom, kitchen and bathroom
- Any other separate, self-contained living accommodation
Where are the rules stricter?
- Listed buildings: any outbuilding within the curtilage of a listed building needs planning permission.
- Conservation areas and the Cotswolds National Landscape: outbuildings, enclosures and pools at the side of the house need planning permission.
- National Landscapes, National Parks, the Broads and World Heritage Sites: buildings, enclosures and pools more than 20m from the house are limited to 10m² in total.
- Flats and maisonettes: these permitted development rights do not apply.
- Article 4 directions or planning conditions can remove the rights altogether.
What base does a garden room need?
A garden room is only as good as what it stands on. A level, properly drained base stops doors sticking, floors bouncing and damp creeping in. Depending on the building and the ground, that might be a concrete slab, a pad or ground-screw system, or full foundations for a heavier masonry building.
- Check the positionConfirm the building is behind the front of the house, within the height limits for its distance from the boundary, and within the 50% coverage limit.
- Plan servicesRun ducts for electricity and data before the base goes down.
- Build the baseExcavate, lay a compacted sub-base and form a level slab or pad base, with drainage away from the building.
- Build the roomTimber frame, masonry or modular, finished to match how you will use it.
What we build: garden rooms, garden offices, summer houses, barns, garages and pergolas, from the base up, so the building and what it stands on are built by one team.
Planning a project like this?
We can visit the site, explain what your project needs and give you a clear, itemised quote.
Frequently asked questions
Can I sleep in my garden room?
Not as separate, self-contained accommodation without planning permission. Permitted development covers buildings used incidentally to the house, such as an office, gym or playroom, not an annexe.
Can I put a garden room in front of my house?
Not under permitted development. Outbuildings are not allowed on land forward of the wall forming the principal elevation of the house.
Can my garden room have a veranda or decking?
Verandas, balconies and raised platforms are not permitted development, and any platform must be no more than 0.3m high.
What if my house is listed?
Any outbuilding within the curtilage of a listed building needs planning permission.
Sources and further reading
- Planning Portal: Outbuildings, planning permission
- GOV.UK: Permitted development rights for householders, technical guidance
This article is general guidance for England, correct when last reviewed. Rules differ in Wales and can be changed locally (for example by Article 4 directions or planning conditions), so check with your local planning authority or building control before starting work.