A private swimming pool is one of the biggest projects you can build at home, and one of the most rewarding. The planning side is often simpler than people expect, because in planning terms a pool is treated like any other outbuilding. The construction side is where the experience counts. Here is what you need to know before you dig.

When does a swimming pool need planning permission?

Usually permitted development

  • A garden pool behind the house
  • An indoor pool hall within the outbuilding height limits
  • Pools that keep buildings and additions within half the land around the house

Needs planning permission

  • A pool forward of the front of the house
  • A pool at the side of the house in a conservation area or the Cotswolds
  • Any pool at a listed building
  • A pool hall above the height limits

Pool halls follow the outbuilding height limits: 2.5m within 2m of a boundary, otherwise 4m with a dual-pitched roof or 3m with any other roof, with eaves no higher than 2.5m. See the full outbuilding rules.

In a National Landscape?In the Cotswolds and other National Landscapes, buildings, enclosures and pools more than 20m from the house are limited to 10m² in total, which rules out most pools far from the house without planning permission.

Indoor or outdoor pool?

Outdoor poolIndoor pool (pool hall)
UseMainly seasonal, unless heated and coveredAll year round
PlanningOutbuilding rules for the pool and any enclosureOutbuilding rules for the pool hall
Building regulationsDepends on what is built around itApplies, especially ventilation and thermal performance
Plant roomNeeded for filtration and heatingNeeded, plus ventilation and dehumidification
LandscapingKey to the finished resultMatters for access and the view out

Does an indoor pool need building regulations approval?

A pool hall must meet the building regulations, with particular attention to ventilation and thermal performance, because warm, humid air causes condensation and heat loss if the building is not designed for it. The same planning rules and building regulations apply to buildings housing hot tubs and sauna cabins.

Plan the plant room earlyFiltration, heating and, indoors, air handling all need space. Leave room for a plant room at the design stage rather than squeezing it in later.

Should I choose a one-piece or a bespoke pool?

One-piece pool

  • Built off-site, then transported and lifted into place
  • Saves time during construction
  • Set shapes and sizes
  • Needs access for delivery and lifting

Bespoke pool

  • Formed on site
  • Any shape, size or design
  • Suits awkward sites and integrated landscaping
  • Longer build on site

How is a swimming pool built?

  1. Design and checksAgree size, position and type, and confirm whether planning permission or building regulations approval is needed.
  2. Excavation and groundworksDig out, manage any ground water, and prepare the base, with temporary support where space is tight.
  3. The pool structureLift in a one-piece shell, or build the bespoke structure on site.
  4. Plant and servicesPipework, filtration, heating and electrics, connected to the plant room.
  5. The pool hallFor indoor pools, the building itself, designed for ventilation and insulation.
  6. Surrounds and landscapingPaving, steps, lighting and planting to finish the space.

What pool projects have you built?

Coombe Farm, Malvern: a subterranean pool house, swimming pool and associated works, including enabling works and retaining walls to widen access.

Combe House, near Oxford: a pool house, pool and tennis courts, alongside the restoration of a Grade II listed manor house.

We also build jacuzzis, tennis courts and 4G pitches, and because we are groundworks contractors first, the digging, drainage and retaining structures are done by the same team. See the case studies.